§ 117.480. Mermentau River.
75 words·~1 min read·
/us/cfr/t33/s§ 117.480·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
The draw of the S82 bridge, mile 7.1 at Grand Chenier, shall open on signal; except that, from 6 p.m. to 6 a.m. the draw shall open on signal if at least 4 hours notice is given. During the advance notice period, the draw will open on less than 4 hours notice for an emergency and will open on demand should a temporary surge in waterway traffic occur. \[CGD8-94-027, 60 FR 14221, Mar. 16, 1995\]
Connections2 cite this
Cited by 2 sections
Citation graph
cites case law
§ 117.480
Mermentau River.
Fed. Reg.×2
Cites 0Cited by 2 across 1 source